# Sites with power available now.

> Existing capacity with power, cooling, and fiber verified, and ranked by months to first MW.

[Map requirements](https://ardus.ai/contact)

## How we find and rank sites.

A site enters the ranking after agents verify the power, cooling, fiber, access, and the timeline behind its go-live date.

- **Existing capacity.** Halls, suites, and cages with spare MW today: colocation, converted facilities, and idle enterprise or mining sites.
- **Power path.** Utility feed, on-site generation, or both, each checked before it enters the ranking.
- **Power per site.** Contracted MW, substation capacity, and redundancy, from the utility contract.
- **Cooling per site.** Water and space for air, rear-door, or direct-to-chip, so an 80 kW rack requirement ranks only sites that can cool it.
- **Site states.** Sourced, verified, ranked, contracted, live. Each state is timestamped against the requirement.
- **Matched to you.** Every site is ranked against your MW, region, density, and go-live date.

## What we check on every site.

Each check has a document behind it: a utility contract, a permit, an invoice, a dated photo.

- **Power contract.** Contracted MW, ramp schedule, curtailment rights, term.
- **Substation.** Capacity, feeds, switchgear condition, transformer status.
- **Cooling.** Air or liquid, kW per rack, water source.
- **Occupancy and permits.** Certificate of occupancy, electrical and air permits in place, issuing authority, status.
- **Availability evidence.** Spare MW, what is built out, what is already leased, dated photos and invoices.
- **Go-live.** Months to first MW, set from the evidence above.
- **Control.** Site title or lease, sublease rights, signing authority.
- **Fiber.** Path confirmed, two diverse carriers where required.
