# Ardus: Powered Data Center Capacity from 1 MW to 10 MW

> Get your compute live in weeks. Map your requirements, 1 MW to 10 MW. Ardus agents find existing powered data center capacity that fits, verify it, and set your go-live date. You bring the GPUs.

[Map requirements](https://ardus.ai/contact)

## How it works

- **Requirements.** MW, density, region, and go-live date.
- **Path.** The fastest existing site for your load.
- **Move in.** Terms, access, fiber, fit-out.
- **Live.** Racks live on the date we give you.

## Agents do the legwork.

They search sites, confirm spare power and cooling, check fiber and access, pull quotes and lead times, and model your schedule.

## Existing capacity, matched to you.

Tell us the MW, region, and go-live date. Agents find powered capacity that already exists, verify it, and set the date. You bring the GPUs.

- **[Modeling](https://ardus.ai/features/modeling).** Your requirements in. Site, go-live date, and critical path out.
- **[Sites](https://ardus.ai/features/sites).** Existing sites with power and cooling available now, scored by months to first MW.
- **[Power](https://ardus.ai/features/sites).** Contracted MW, substation capacity, and redundancy, checked per site.
- **[Cooling and density](https://ardus.ai/features/sites).** Air, rear-door, or direct-to-chip liquid, matched to your kW per rack.
- **[Fiber and access](https://ardus.ai/features/move-in).** Two diverse carriers where required, plus access, security, and remote-hands terms.
- **[Terms](https://ardus.ai/features/move-in).** Capacity, term, and monthly pricing for the MW you need.

## Map your requirements.

From 1 MW to 10 MW. [Map requirements](https://ardus.ai/contact) and book a 30-minute call, or email [hello@ardus.ai](mailto:hello@ardus.ai).
